aboutsummaryrefslogtreecommitdiffstats
path: root/src/shutdown/s6-linux-init-shutdown.c
Commit message (Collapse)AuthorAgeFilesLines
* Prepare for 1.0.8.1Laurent Bercot2022-11-291-1/+2
| | | | Signed-off-by: Laurent Bercot <ska@appnovation.com>
* Allow normal users to run s6-l-i-hpr/sLaurent Bercot2021-12-281-2/+2
| | | | | | Instead of testing the euid, test writability to the shutdownd pipe. Signed-off-by: Laurent Bercot <ska@appnovation.com>
* Prepare for 1.0.6.4, adapt to skalibs-2.11.0.0Laurent Bercot2021-08-101-8/+8
| | | | Signed-off-by: Laurent Bercot <ska@appnovation.com>
* Fix them bugsLaurent Bercot2021-02-121-20/+27
|
* bugfix: wall message on non-immediate shutdown(8)Laurent Bercot2021-02-121-9/+52
|
* Add -i option to shutdown and hprLaurent Bercot2020-11-061-2/+5
|
* Print HPR_BANNER_WALL to all users in shutdown(8) tooLaurent Bercot2019-09-061-1/+9
|
* shutdown protocol now transmits a timeout; move to stopwatch APILaurent Bercot2019-09-061-0/+1
|
* Add -H and -P to s6-l-i-shutdown, prepare for 1.0.2.0Laurent Bercot2019-06-091-2/+10
|
* No utmpx errors; no additional /dev/console message when shutdown -a failsLaurent Bercot2019-05-121-11/+1
|
* Careful with that stack, EugeneLaurent Bercot2019-05-071-1/+1
|
* Fix shutdown time bugLaurent Bercot2019-05-061-4/+4
|
* fix hpr -w, refactor shutdownLaurent Bercot2019-05-061-12/+9
|
* It builds! Tomorrow: skeletons for stage2, stage3 and runlevel scripts.Laurent Bercot2019-04-161-0/+268